Case Studies

For detailed examples of how the Boulting Group have improved businesses across many industrial sectors, please browse through some of our case studies below.


« Previous | Page: 1 2 3 | Next »

Thumbnail
Batch process control system
As part of a factory relocation project, new process plant and a new process-control system were required for the production of a leading range of cereal bars.
Sectors
- Food and Drink
Services
- Electrical Systems
Read the case studyRead the case study
Thumbnail
CLD robotics flexi-lab
The new laboratory was created as a new robotics suite, an amalgamation of two existing laboratories into one larger area.
Sectors
- Pharmaceuticals
Services
- Specialist Environments
Read the case studyRead the case study
Thumbnail
Clean fuels
Clean fuels for BP Oil at Coryton.
Sectors
- Oil and Gas
Services
- Electrical Services
Read the case studyRead the case study
Thumbnail
Control system replacement
As the existing process-control system became difficult to support, the decision was made to upgrade to a state-of-the-art system based on Siemens' TIA philosophy.
Sectors
- Chemical/Petrochemical
Read the case studyRead the case study
Thumbnail
Environmental fate facility
This new-build, state-of-the-art, BREEAM-assessed facility combines two floors of research laboratory and specialist CT rooms, a library and break-out areas on the third floor, and a fallow ground floor for future development.
Sectors
- Pharmaceuticals
Services
- Specialist Environments
Read the case studyRead the case study
Thumbnail
Film coating facility
The Boulting Group carried out the complete design and construction of new IS0 6 & 7 cleanrooms within an existing portal-framed building.
Sectors
- Pharmaceuticals
Read the case studyRead the case study
Thumbnail
Integrated protein production & crystallography suite
The new facility combined four scientific areas comprising flexible laboratory, x-ray/crystallography, a cold laboratory and a heavy instrument room. Designed in line with cGLP, the project value was £800k.
Sectors
- Pharmaceuticals
Read the case studyRead the case study
Thumbnail
Large-scale laboratory
The Boulting Group was asked to supply, fabricate and install stainless steel, carbon, Hastelloy and C22 pipework, and spring hanger-brackets.
Sectors
- Pharmaceuticals
Services
- Mechanical Services
Read the case studyRead the case study

« Previous | Page: 1 2 3 | Next »