Case Study: Alderley Park Energy Centre (APEC) Project

Location: Macclesfield, UK
Client: AstraZeneca
Project: Alderley Park Energy Centre (APEC) Project
End User: AstraZeneca
Contract Value: £7.3m

Contract Scope:

Since 2005, Boulting Group has worked as a key alliance contractor with AstraZeneca to create a single Energy Centre providing the entire AZ Alderley Park Site with a modern, efficient, reliable and environmental source of high pressure hot water, steam and compressed air. As a result of Boulting's success in provision of M&E services for the initial expansion of the Energy Centre covering  HPHW (High Pressure Hot Water), Boulting secured the final phase of works covering the sites steam supply.

  • Overall Project timescale: 2005 - 2009.
  • Steam / Compressed air phase: 2007 - 2009

 APEC plant capability:

  • 60MW of High Pressure Hot Water at 176°C and 19barg
  • 18,000kg/hour of Steam operating at 7barg
  • Expansion of site pipework distribution system
  • Condensate recovery system
  • New compressed air system to feed site
  • Salt saturator and water softening system
  • Associated E&I requirements

   Scope of work

        Design

  •  Mechanical - Thermal, stress, structural,
  •  Electrical - Load, cabling, routing, MCC
  •  Instrumentation - Specification
  •  Process Control - URS, FDS, system characterisation, PLC, SCADA

       Supply and Installation

  •  Boilers - Specification, procurement, installation
  •  Softened water & hotwell tanks - Specification, procurement, installation
  •  Heat recovery equipment - Specification, procurement, installation
  •  Pumps - Specification, procurement, installation
  •  Compressed air system - Specification, procurement, installation
  •  MCCs - Design, manufacture, supply, installation
  •  Oil Storage system
  •  Pipework/Structural Steelwork - Design, fabrication, installation
  •  Ancilliary equipment and control systems
  •  Commissioning - Managed the commissioning process.
  •  Training - Validated training given to operatives.

       Strategy 

  • Alliance team approach
  • Design development - included ±10% estimate data
  • Minimise disturbance and service outage
  • Construction approach - Alliance with civils. Managed 10+ sub-contracts

       Project details

  • Mechanical / piping / instruments / electrical design
  • Pump specification, supply and installation
  • Design provided to allow unlimited access to M&E services in ducts.
  • Pipework stress and flexibility analysis
  • Underground ‘walk-though' service ducts
  • Dual fuel capability for the APEC boilers
  • More efficient boilers - expect 375,000 annual saving