Case Study: Clean fuels
|
Contract Scope:
Approximate quantities of major equipment & materials
Cable containment: 7,700m
Power & instrument cable: 82,000m
Max installed rate for cable: 7,500m/week
Instrument pipework: 6,400m
Instrument loops: 933
Instruments: 1,072
Trace heating cable: 0m
Equipment installation :4 transformers
Switchgear/ MCCs manufacturer: S&I
UPS system: MGE
Fire detection system: Allison
Luminaires: 292 installed
Control system: Foxboro IA
Other information
Safety statistics: RIFR 0, AIFR 3.6
Labour agreement: NAECI Category 1 Coryton contractors agreement
Documentation: Test and inspection sheets