Case Study: Replacement GMP receivers
|
Contract Scope:
The Boulting Group was asked to replace two existing horizontal, non-agitated receivers with new vertical, glass-lined, agitated receivers as part of a GMP improvement project.
New instrumentation was required to measure vessel contents’ temperature, via the baffle and the bottom run-off valve, and load cells were needed to measure content. A sampling system was provided for the vessel contents.
Operator access platforms were implemented, to allow operator/maintenance access to the vessel-head for inspection and sample-taking. A lifting beam was installed to allow top works removal.
Services supplied
- Scope development, including HAZOP
- Detailed design and engineering and relief stream verification
- CDM role as principal contractor
- Installation
- Validation activities, including preparation of IQ and OQ and execution
- Calibration
- Hazardous area inspections
- Commissioning
Equipment supplied
- Structural steelwork, platforms, lifting beam and hoist
- Pipework including lined pipe
- Sample system
- Inline items including bursting discs, filters, sight glasses, valves
- Load cells, temperature transmitters and local indicators
- VSD cabinets