Case Study: WwTW at Existing Facility

Case study: WwTW at Existing Facility
Location: Bolton
Client: Major Water Supplier
Project: Expansion of Existing WwTW
Contract Value: £2.7 m

Contract Scope:

Project description

Expansion of existing WwTW to include: 

  • Refurbishment of 12 100 mt long Aeration Lanes
  • New Sludge Treatment Plant
  • New Inlet Works
  • 4 new Settlement Tanks
  • Upgrade and extend the HV Ring Main
  • New Chemical Plant
  • Kiosk Building Services in Fire Alarm and Intruder

Project Scope

Design

Full design package from conceptual design to include:

  • Cable Calculation/Schedules
  • Single Line Diagrams
  • Loop Drawings
  • System Architecture (Fibre, Ethernet and Profibus)
  • As-Built Packages
  • Building Services (inc Fire and Intruder Alarms)

Installation

Development of conceptual Client documentation to provide detailed installation working packages for Installation, Testing and Commissioning 