Case Study: WwTW at Existing Facility
|
Contract Scope:
Project description
Expansion of existing WwTW to include:
- Refurbishment of 12 100 mt long Aeration Lanes
- New Sludge Treatment Plant
- New Inlet Works
- 4 new Settlement Tanks
- Upgrade and extend the HV Ring Main
- New Chemical Plant
- Kiosk Building Services in Fire Alarm and Intruder
Project Scope
Design
Full design package from conceptual design to include:
- Cable Calculation/Schedules
- Single Line Diagrams
- Loop Drawings
- System Architecture (Fibre, Ethernet and Profibus)
- As-Built Packages
- Building Services (inc Fire and Intruder Alarms)
Installation
Development of conceptual Client documentation to provide detailed installation working packages for Installation, Testing and Commissioning