Fondant-mixing
A new mixing process was required for the manufacture of flavoured fondant centres for milk chocolates, involving mixing the ingredients, processing, shaping and drying.
Sectors
- Food and Drink
Services
- Electrical Systems
Read the case study
A new mixing process was required for the manufacture of flavoured fondant centres for milk chocolates, involving mixing the ingredients, processing, shaping and drying.
Sectors
- Food and Drink
Services
- Electrical Systems
Integrated protein production & crystallography suite
The new facility combined four scientific areas comprising flexible laboratory, x-ray/crystallography, a cold laboratory and a heavy instrument room. Designed in line with cGLP, the project value was £800k.
Sectors
- Pharmaceuticals
Read the case study
The new facility combined four scientific areas comprising flexible laboratory, x-ray/crystallography, a cold laboratory and a heavy instrument room. Designed in line with cGLP, the project value was £800k.
Sectors
- Pharmaceuticals
Large-scale laboratory
The Boulting Group was asked to supply, fabricate and install stainless steel, carbon, Hastelloy and C22 pipework, and spring hanger-brackets.
Sectors
- Pharmaceuticals
Services
- Mechanical Services
Read the case study
The Boulting Group was asked to supply, fabricate and install stainless steel, carbon, Hastelloy and C22 pipework, and spring hanger-brackets.
Sectors
- Pharmaceuticals
Services
- Mechanical Services
New processing plant
The Boulting Group undertook the design, installation and commissioning of the control systems for a new milk-processing plant.
Sectors
- Food and Drink
Read the case study
The Boulting Group undertook the design, installation and commissioning of the control systems for a new milk-processing plant.
Sectors
- Food and Drink
Primary inoculation and secondary incubation facility
The project included the complete design and construction of an entirely new primary inoculation and secondary incubation facility. It was carried out in two phases, with a total project value of £1.5m.
Sectors
- Pharmaceuticals
Services
- Specialist Environments
Read the case study
The project included the complete design and construction of an entirely new primary inoculation and secondary incubation facility. It was carried out in two phases, with a total project value of £1.5m.
Sectors
- Pharmaceuticals
Services
- Specialist Environments
Processing Line – Control System Upgrade
Logrono - Spain
Sectors
- Tobacco
Services
- Electrical Systems
Read the case study
Logrono - Spain
Sectors
- Tobacco
Services
- Electrical Systems
Replacement GMP receivers
The Boulting Group was asked to replace two existing horizontal, non-agitated receivers with new vertical, glass-lined, agitated receivers as part of a GMP improvement project.
Sectors
Services
- Mechanical Services
Read the case study
The Boulting Group was asked to replace two existing horizontal, non-agitated receivers with new vertical, glass-lined, agitated receivers as part of a GMP improvement project.
Sectors
Services
- Mechanical Services
ResNET data infrastructure
ResNET is the project title for the delivery of high-speed internet access within every student accommodation room for halls of residents. The project was delivered over a three-month period at four occupied campus locations throughout Birmingham.
Sectors
Read the case study
ResNET is the project title for the delivery of high-speed internet access within every student accommodation room for halls of residents. The project was delivered over a three-month period at four occupied campus locations throughout Birmingham.
Sectors
« Previous | Page: 1 2 3 | Next »