Specialist experience in pharmaceuticals

The Boulting Group has extensive experience delivering mechanical, electrical & instrumentation and electrical engineering systems to the pharmaceutical industry.

Our broad knowledge and experience mean we know and understand all the relevant regulations and safety standards, and can deliver a fast result of exceptionally high quality and safety performance.

We can offer you full mechanical, electrical & instrumentation support services throughout the life of your project - from project management, design, fabrication and manufacture through to installation, test, commissioning and maintenance.

We specialise in the design and build of sophisticated clean and sterile facilities.

  • Sterile Environments and Cleanrooms. ISO 8, class 100,000 – ISO 5, class 100
  • ACDP Containment Levels 1 – 4
  • New Laboratories and Upgrades
  • Production, Packaging and Storage Facilities
  • HVAC Mechanical Building Services

Pharmaceuticals Case Studies

Thumbnail
Wound therapeutics textile line
The Boulting Group carried out the complete design and construction of a new IS0 8 cleanroom within an existing portal-framed building.
Read the case studyRead this case study
Thumbnail
Primary inoculation and secondary incubation facility
The project included the complete design and construction of an entirely new primary inoculation and secondary incubation facility. It was carried out in two phases, with a total project value of £1.5m.
Read the case studyRead this case study
Thumbnail
Large-scale laboratory
The Boulting Group was asked to supply, fabricate and install stainless steel, carbon, Hastelloy and C22 pipework, and spring hanger-brackets.
Read the case studyRead this case study
Thumbnail
Integrated protein production & crystallography suite
The new facility combined four scientific areas comprising flexible laboratory, x-ray/crystallography, a cold laboratory and a heavy instrument room. Designed in line with cGLP, the project value was £800k.
Read the case studyRead this case study
Thumbnail
Film coating facility
The Boulting Group carried out the complete design and construction of new IS0 6 & 7 cleanrooms within an existing portal-framed building.
Read the case studyRead this case study
Thumbnail
Environmental fate facility
This new-build, state-of-the-art, BREEAM-assessed facility combines two floors of research laboratory and specialist CT rooms, a library and break-out areas on the third floor, and a fallow ground floor for future development.
Read the case studyRead this case study
Thumbnail
CLD robotics flexi-lab
The new laboratory was created as a new robotics suite, an amalgamation of two existing laboratories into one larger area.
Read the case studyRead this case study

« Back to sector list