Location: | Macclesfeild |
---|---|
Client: | AstraZeneca |
Project: | Term Contract |
With Boulting’s depth and breadth of knowledge, extensive experience and backed by our in-house capabilities we have successfully undertaken 765 multi-disciplinary engineering solutions during our Term Contract at AstraZeneca.As part of AstraZeneca’s strategic initiative to reduce Co2 emissions Boulting Group installed 256 solar panels onto the roof of an existing office building.
As part of AstraZeneca’s strategic initiative to reduce Co2 emissions Boulting installed 256 solar panels onto the roof of an existing office building.
As part of the AZ energy conservation project, Boulting designed, installed, validated and commissioned a new chilled water system to supply a production facility and other future production areas.
With a scope to implement the refurbishment within a tight deadline, Boulting’s efficiency and in-house design capability ensured the meeting rooms were maximised in the shortest possible time.
Collaboration from concept to construction
Read our take on the benefits of integrated project delivery (IPD) and the collaborative culture it produces.
Engineering standards and the importance of professional registration
Here, Glyn Shawcross, Boulting Design Manager, explores the importance of working with accredited contractors who invest in training for employees.