AstraZeneca Term Contract


Location: Macclesfeild
Client: AstraZeneca
Project: Term Contract

With Boulting’s depth and breadth of knowledge, extensive experience and backed by our in-house capabilities we have successfully undertaken 765 multi-disciplinary engineering solutions during our Term Contract at AstraZeneca.As part of AstraZeneca’s strategic initiative to reduce Co2 emissions Boulting Group installed 256 solar panels onto the roof of an existing office building.

Example of cost effective reduction in Co2 emissions

As part of AstraZeneca’s strategic initiative to reduce Co2 emissions Boulting installed 256 solar panels onto the roof of an existing office building.

  • 256 x 310 watt solar panels
  • Local planning department liaison
  • Full structural/Architectural survey and CAD drawings produced
  • Bespoke panels engineered to support building structure and environment
  • Purpose built automated G59 with export limitation
  • Delivered on time in line with project budget
  • Technical impact assessment completed for integration
  • Zero Impact on BAU
  • 100% of buildings energy needs met at peak performance
Example of contribution to new energy efficiency targets

As part of the AZ energy conservation project, Boulting designed, installed, validated and commissioned a new chilled water system to supply a production facility and other future production areas.

  • Concept design
  • Project delivery
  • Installation of two temporary chillers configured to production facility
  • Prefabrication of structural steelwork
  • Installation of new pumps and Hydraulic Decoupler
  • Design, fabrication and installation of new pipework
  • Design and installation of Electrical instrumentation
  • System integration of PLC to existing SCADA for automation
  • Commissioned with handover of initial Phase 1
  • Automation of strict 2 degrees tolerance achieved
Example of on site team efficiency: Meeting rooms refurbished to reflect Astra Zeneca professional standards

With a scope to implement the refurbishment within a tight deadline, Boulting’s efficiency and in-house design capability ensured the meeting rooms were maximised in the shortest possible time.

  • Functional design produced to meet concept vision
  • Provided infrastructure for AV suite
  • Installation of RAKO lighting system
  • Redesign ensures correct access for maintenance to suspended ceilings
  • Boulting on site design team for maximum project efficiency
  • Quick efficient problem solving as onsite presence

Please download our full PDF here:

Highlights


Collaboration from concept to construction
Read our take on the benefits of integrated project delivery (IPD) and the collaborative culture it produces.

Read more

Engineering standards and the importance of professional registration
Here, Glyn Shawcross, Boulting Design Manager, explores the importance of working with accredited contractors who invest in training for employees.

Read more