Welcome to Boulting Ltd
info@boulting.co.uk +44 (0) 1925 446000

Glasgow Recycling and Renewable Energy Centre


24th March

Boulting are building furnaces worth c £2.9m as part of a Waste to Energy Plan that recycles household bin waste and converts to reusable energy with only 8% of black bag waste going to landfill. The construction consists of three fuel furnaces built to the same specification, each weighing approximately 95 Tonnes and being constructed in three phases consisting of a Fuel Hopper, Fuel Chute and a Fuel Feeder Unit. The completed furnaces are due for site installation in April 2014.

Glasgow Recycling and Renewable Energy Centre


Highlights


Collaboration from concept to construction
Read our take on the benefits of integrated project delivery (IPD) and the collaborative culture it produces.

Read more

Engineering standards and the importance of professional registration
Here, Glyn Shawcross, Boulting Design Manager, explores the importance of working with accredited contractors who invest in training for employees.

Read more