Boulting has been commissioned by a global beverage business to expand utilities at a new manufacturing facility in Nigeria.

The world leading premium drinks supply represents an outstanding collection of alcoholic beverage brands across spirits, wines and beers. Its new packaging facility is based in Ogba and will support the clients supply operations around the world.

Boulting will supply both Mechanical and Electrical services and the full scope of work includes design, fabrication and installation of pipework, steelwork and electrical services.

Mechanical Installation

Mechanical scope involves providing detailed design, fabrication and installation of a new utility pipework service at the clients new facility, including Steam, Co2, IMS, Condensate, Caustic and Water.

Mechanical Installation

Boulting will undertake the full design, producing a 3D model of the installation, as well as designing and fabricating all steel work pipe bridges.

Pipework meterage of 2100m 30 inline items will be fabricated and installed over a 9 week fast track program on site at the clients Nigerian facility.

This is the first mechanical installation in Nigeria that Boulting have carried out and all mechanical works will be completed by Boulting UK personnel from Project Manager to advanced craftsmen.

Electrical Installation

Electrical scope includes detailed design and construction of all electrical services to the new packaging facility. This consists of:

  • The existing HV network will first need be accessed and extended to a new packaging distribution to substation. This will a protection study and settings for the revised loading and modifications to the HV switchgear to accept an additional 2MVA transformer.
  • Design and installation of high level cable containment to accommodate supply cabling to the new facility. LV Distribution supplies, lighting and small power distribution will be installed to two bottling lines.
  • Design and installation of a high bay lighting system to 600 Lux, incorporation of the existing lighting installation and the installation of emergency lighting system.
  • Design and installtion of small power distribution for the facility for 400Volt, 110Volt and 24Volt distribution.

Electrical Installation

Installation of all electrical services will be carried out by fully qualified local electricians under the supervision of Boulting UK personnel.

Highlights


Collaboration from concept to construction
Read our take on the benefits of integrated project delivery (IPD) and the collaborative culture it produces.

Read more

Engineering standards and the importance of professional registration
Here, Glyn Shawcross, Boulting Design Manager, explores the importance of working with accredited contractors who invest in training for employees.

Read more